무료카지노게임

1. About Top-Down Model



Concept of Top-Down Model


"The costs are calculated by valuation of assets using the latest acquisition cost, on the basis of the NTT network currently in operation as a whole system (including replacement with the modern equivalent assets 무료카지노게임djustment of excess capacity."



(참고)

무료카지노게임

1.

In the U.K., BT has developed a top-down model similar to NTT's.

무료카지노게임

2.

In NTT's network, management has been successfully improving efficiency as evidenced by the annual reduction of the interconnection charges.
(Over the last four years, the ZC interconnection charge has reduced by 40%. If the GC interconnection charge is considered, the reduction amounts to 70%.)

무료카지노게임

3.

Reports have been received from outside organizations* as to the validity of the model 무료카지노게임ccuracy of the calculation.
�i*US Consulting firm, SPR (Strategic Policy Research,Inc); and an accounting firm, CL (Coopers & Lybrand)) 무료카지노게임